The closure of pipelines and skin, repairs of leaks in the boat and bringing stability to the ship because it was crooked were carried out. A floating dam was installed until works on recovery and bringing the ship to stable state were done.
Tel: +382 30 346 232 E-mail: [email protected]
Popovići 46, 85000 Bar, Crna Gora